You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Jalan Krendang Utara Dinormalisasi

Connecting Channel Jalan Krendang Utara Normalized

The connecting channel Jalan Krendang Utara at RW 03, Krendang Urban Village, Tambora Sub-district, West Jakarta is normalized. It is predicted the normalization to complete in the end of November.

Mud and trash have disturbed the water flow

West Jakarta Head Sub-dept. of Water Management, Imron Syahrin, said the channel width is two meters and length by 500 meters. The channel is full with mud and trash.

“Mud and trash have disturbed the water flow,” he said, Tuesday (11/1).

Dirty Drains in Krendang Cleaned

He added that the water of the channel will overflow if the channel is not dredged. His side deployed 15 freelancers to dredge the channel.

Linked News
Popular News indeks
  1. Pramono Pushes to Complete Long-Delayed Pluit JLNT by March 2027

    access_time20-11-2026 remove_red_eye663 personDessy Suciati
  2. JAF 2026 Highlights Maritime Heritage and Coastal Architecture

    access_time21-11-2026 remove_red_eye640 personAnita Karyati
  3. Jakarta Strengthens ASEAN Cooperation on Climate, Transport, and Youth

    access_time20-11-2026 remove_red_eye612 personFolmer
  4. BORJU Markets 200 Local Products

    access_time20-11-2026 remove_red_eye577 personAnita Karyati
  5. Jakarta Hosts 2026 UCWDC Asian Championship with 280 Dancers from Five Countries

    access_time20-11-2026 remove_red_eye561 personBudhi Firmansyah Surapati